CENTRIOM OOD

SHPP "Apriltsi" is situated on Vidima river in the area of the town of Apriltsi, Lovech region and has a built-up capacity of 580 kW. It is equipped with two horizontal turbines Francis which process 2.5 m³/s of water with net head of 27 m. The plant was put into operation at the end of 2003.